SolarArc Holdings

SolarArc Holdings

Headquarters Zenith Station, Ethenor B
Operational Scope Primarily operates in the Ethenor Prime system and surrounding areas, with a focus on orbital megastructures and solar energy solutions.
Membership Count 1500
Specialization Solar energy technology and orbital infrastructure development.
Description

SolarArc Holdings specializes in solar harnessing and advanced Helios-based power solutions, crucial for mid-orbit station infrastructures. The corporation is renowned for its innovative designs that utilize tachyon resonance to enhance energy efficiency and transmission across vast distances. Its projects include the construction of solar arrays at strategic Lagrange points, facilitating energy distribution to various habitats and stations throughout the Emberfall Convergence.

Organizational Structure

Hierarchical corporate structure with divisions for research, development, engineering, and operations, overseen by an executive board.

Influence

SolarArc Holdings is a key player in the Emberfall Convergence, influencing energy policies and technological advancements across the region.

Summary

As a leading corporation in solar energy solutions, SolarArc Holdings plays a crucial role in powering the Emberfall Convergence, driving innovation and sustainability in energy production and distribution.

Tags solar energy orbital infrastructure innovation tachyon technology sustainability

Events

  • Founding of Zenith Station (3912)

    The establishment of Zenith Station marked the beginning of SolarArc Holdings' dominance in solar energy technology, providing a central hub for research and development.

  • Tachyon Resonance Breakthrough (3985)

    A significant technological advancement in harnessing tachyon resonance for energy transmission, allowing SolarArc to increase energy output by 300%.

  • Lagrange Point Energy Initiative (4021)

    Launch of the initiative to build solar energy stations at Lagrange points, revolutionizing energy distribution across the Ethenor Prime system.

  • Solar Array Theta Completion (4025)

    Commissioned the largest orbital heliostat in Ethenor orbit.

Back to Tour